Skip to Content
author's profile photo Former Member
Former Member

Change the Valid-to Date in BOM

Dear PP gurus,

We would like to change Valid-to date in BOM for Header as well as Component material from 31.12.9999 to flexible date.

I have done the following settings to achieve the same:

1. ECM is active.

2. Created a Effectivity Type using DATE as Effectivity parameter. This is chosen when BOM/ Routing is modified.

I have created a Change number and changed BOM with reference to change number.

But I am still unable to Change Valid-to Date from 31.12.9999 to a date of my choice. The value is set to 31.12.9999 and field is not editable.

Please help me resolve the issue.

Thanks in advance.

Regards, Namratha

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    Posted on May 26, 2014 at 02:16 PM

    As you can see in the image... you create ECM of today's date and done the changes.

    Go to CS02...remove the today's date form valid form date filed and put the old valid from date.

    Then you can see, your desired Valid to date

    Please get back to us if any doubt.


    SCN.PNG (48.5 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 27, 2014 at 08:14 AM

    Hello Prasanth,

    I have created a change number valid from today as suggested by you.

    But when i go to CS02 and change valid-from date manually then the value from change number is getting copied automatically and a warning appears.

    I have not attached the effectivity type to the change number.

    I also want to know how to set Valid-to Date to a flexible date(other than 31.12.9999) when i create BOM.

    Please guide.

    Regards,

    Namratha

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 27, 2014 at 09:26 AM

    Namrtha- When you create change number, you can see valid from date of Change number. When you apply this change number to any master data like Routing BOM, material this valid from date gets copied in to that If you want to check refer my recent post. Hope this will be helpful. Thanks Prashant

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.