cancel
Showing results for 
Search instead for 
Did you mean: 

Scheduling for certain Equipment only from a maint. plan

Former Member
0 Kudos

Hello,

I have maintained many Equipment as separate line item in a Main. Plan. While scheduling, I donèt see option to select certain Equipment only.


I would like to maintain one or few main. plan, one each for a set of equipment. And then call a few from that one set of equipment. E.g. Total Equipment 120,000. 10 types each 120,000. Thus 10 maint. plans. Call Type I/Maint. Plan 1 and Schedule 1-10,000 on Jun 1.  Call Type 2/Main Plan 2 and Schedule 10,001-20,000 on Jul 1 and so on.


Any suggestion please!

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

There is no way to do equipment wise scheduling in IP30. you have to create separate maintenance plans equipment wise and try using sort field in additional so that you can schedule maintenance plan bit easily.

Former Member
0 Kudos

You should define the Maintenance Plan based on how you want to generate the order. There is no provision to select the desired equipments on order creation / scheduling phase.