Hi,
When we perform an action "To Be Approved" for an RFC (Request For Change) in Solution Manager, a mail will be triggered to the respective Change Manager. In that mail, a link will be there which will guide the Change Manager to the SAP Logon Pad.
The problem is, the link in that mail is not pointing towards the required system. It is taking the change manager to Development system instead of Production System.
Can you please help me, how to change this URL link in that e-mail that is being triggered when the action is performed. I just need to remove the Development system URL and paste the Production system URL.
Thanks in advance,
Bharath.