Hi All,

When I am executing CK11N for finished material,its itemization cost is not matching with Cost component view.

Please find attachment for details.

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

ArturoSenosain
Advisor
Advisor
0 Kudos

Hi.

I guess this is a HALB material (semi finished)

22.82 - 22.27 = 0.55 = (0.71 - 0.44) + (2.11 - 1.83)

The CCS is multilevel, so you see the real "raw material cost", in a HALB part of its cost is RAW and part is indirect (activities, overhead, transportation cost between plants or whatever additional cost you have)

Arturo.

Message was edited by: arturo senosain

rajneesh_saxena
Active Contributor
0 Kudos

Hi Arturo

Interesting. But can you please explain little more how this has become possible. I will be obliged.

Regards

Rajneesh Saxena

ArturoSenosain
Advisor
Advisor
0 Kudos

Yes man! I just create this Doc.

Very fast, i made a little mistake but i think the concept is explained.

Arturo.

Former Member
0 Kudos

Thanks Mr.Arturo & Mr. Rajneesh for valuable guidance.

Answers (2)

Answers (2)

Former Member
0 Kudos

Thanks for prompt reply.

I have checked all the assignment in OKTZ of cost elements and its seems OK because I have two plants,for one plant itemization cost is matching with Cost Component view.Is there any Plant specific setting which I have missed.Kindly guide and suggest.


Regards.


Nitin

rajneesh_saxena
Active Contributor
0 Kudos

Dear Nitin

I feel confused.

I would like to invite Sir on the thread to help.

Regards

Rajneesh Saxena

rajneesh_saxena
Active Contributor
0 Kudos

Nitin

For your query me and Arturo are fighting means discussing. Can you please post itemisation screen of mat 12081744 and its cost component view to analyse it better.

Regards

Rajneesh Saxena

rajneesh_saxena
Active Contributor
0 Kudos

Dear Nitin

In OKTZ check the assignment of cost elements against your cost components of labour cost and material cost, you will fin the difference. As total in both the cases is 37.72 means only difference can be in the assignment.

Regards

Rajneesh Saxena

jose_reddy
Contributor
0 Kudos

Hi Rajaneesh sir,

I am extremely sorry if I were wrong...

I could have agreed with you in normal cases as the totals are same. But when I observe the two reports keenly I feel some other reason might have been there.

Please keenly observe the operations and materials again.

Regards....

Jose