on 05-22-2014 3:52 PM
Hi.
I guess this is a HALB material (semi finished)
22.82 - 22.27 = 0.55 = (0.71 - 0.44) + (2.11 - 1.83)
The CCS is multilevel, so you see the real "raw material cost", in a HALB part of its cost is RAW and part is indirect (activities, overhead, transportation cost between plants or whatever additional cost you have)
Arturo.
Message was edited by: arturo senosain
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for prompt reply.
I have checked all the assignment in OKTZ of cost elements and its seems OK because I have two plants,for one plant itemization cost is matching with Cost Component view.Is there any Plant specific setting which I have missed.Kindly guide and suggest.
Regards.
Nitin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Nitin
In OKTZ check the assignment of cost elements against your cost components of labour cost and material cost, you will fin the difference. As total in both the cases is 37.72 means only difference can be in the assignment.
Regards
Rajneesh Saxena
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.