Hi Experts,
We have an issue during standard cost estimation of REM products, Cost of activities that comes through operations from Rate routing is not picked up.
(Warning Message: CK461 - Routing xxxxxxxx either does not exist or contains no operations)
Our BOM Structure is for ex. as below:
Material A (Includes BOM and Routing)
BOM for A
Material B (Includes BOM and Routing)
Material C
Material D, etc
We could see the cost estimation complete structure that includes BOM Materials, Material Cost and Operation Activities and Activities Cost at Product Cost Collector Level, but the same is not available during Standard cost estimation. We have tried running the standard cost estimation using both CK11N as well as CK40N. When we check the quantity structure tab for standard cost estimation for Material A, both BOM and Routing are being picked up, but while calculating the standard cost, the program is considering only the costs associated with BOM and not the Routing.
However, for Material B, for which we had used the same cost center, Activities and Price Planning, the program is considering costs associated with both BOM and Routing.
We are not sure of what went wrong, please advice on this issue.
Thanks & Regards