on 05-21-2014 4:55 AM
Hello Expert,
I have a requirement like below please suggest some solution
One of my finished material having two alternative BOM say 1 and 2 and I have a requirement in MD61 for 500 pcs in current month and another requirmnet in next month for 1000 pcs
Now the when we run MRP I want system should take alternative bom 1 for current month requirement(500 pcs) and system need to take alternative bom 2 for next month requirement(1000 pcs)
Any body have any idea about this solution with less master data maintenance for user
Thanks in Advance
Abu fathima
Abu Fathima,
You can enter the production version details in MD61 schedule line tab.
Use menu function Settings -> Production Version.
Best Regards,
Rajen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Rajen and All
I was looking to the way what you advise,But I have one other constraint here like as below
Requirement was given in the planning plant here we don't maintain bom and routing and the production happening in other plant through special procurement key..
So can you pls advice how we can address this too..
Thanks
Hi Abu Fatima,
in MRP generated Planned orders for next month requirement check the dates. and try to create a manual production order with next month starting dete. and check which BOM system will select.
Thanks&Regards,
Venkat.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
In Mat Master set the selection method by PV and give 1-500 in lot size for the 1st PV and 500-1000 for the 2nd PV.
So during MRP as Mat Master will have the preference, your requirement may be fulfilled.
Pradeep
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Abu,
go to os32 there enter your materilal, plant,BOM usage, alternate bom no. you enter the valid from date as 01.06.2014 and in alternate bom no as 2.
by this system automatically selects The alternate BOM for next Moth.
remember you have to delete the setting if you want to use the alternate 1 in future.
Regards,
Venkat.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can resolve your issue by two ways , either using lot size procedure or using validity period.
Case I:- Using Lot size
You can use lot size procedure in production version in material master MRP 4 view. Kindly note that selection method should be
3 | Selection only by production version |
1. Lot size 0 -500 lot quantity select first BOM in production version
2. Lot size 501 - 9999 or 501 - 1000 quantity select second alternative BOM
This will be used for every time production process.
Case II:- Using Validity period
If you are using this scenario for specific period then you can use this option of validity. Validity can be applied at different level like BOM validity or production version validity date in your case.
a)If you have use validity start date of second BOM from next month then it will not explode in current month for MRP to achieve this use selection method in MRP4 view in material master as follows
1 | Selection by explosion date |
b) You can also restrict selection of BOM for specific period using production version validity
Start validity of second production version from second month to avoid selection in current month MRP.
To achieve this use selection method in MRP4 view in material master as follows
3 | Selection only by production version |
Hope you will get brief idea of selection correct BOM in MRP.
Apart from this there are various different method depends on business scenarios you can adopt your best. For more details of other method see following
Hope above explanation will help you to resolve your issue.
Regards,
Shyam
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
You need to define the PV on the basis of Lot size or validity date also you can assign the PV in MD61 as suggested by Rajen, Maintain the BOM selection method as 2/3 in MRP 4 view.
Regards,
Anupam Sharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
You can set BOM qty from & BOM qty to in BOM header screen. for your case you can set 0 to 500 for alt 1 & 501 to 999999 for alternate 2.
Note that everytime there is plan order for more than 500 , it will pick up Alt 2.
Best Regards,
Jatin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
106 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.