Skip to Content
author's profile photo Former Member
Former Member

Storage type search sequence

Hi Experts,


In my warehouse, i have configured all my settings for normal putaway process

1.Define Storage Type Search Sequence for Putaway

2.Assigned Storage Types to Storage Type Search Sequence

3.Specify Storage Type Search Sequence for Put-away

4.Optimize Access Strategy for Storage Type Search: Putaway


My question is that when i have many different storage type in my warehouse, how the product will pick the storage type for putaway process.

I did all the settings but it was not selecting required storage type in my inbound process.


Thanks

Saba

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    Posted on May 08, 2014 at 09:44 PM

    Hi

    Create Putaway control indicator in config and assign in mat mas /scwm/mat1.

    same ptaway control indicator assign to WPT+Storage Type Search Sequence for Put-away config under putaway strategy.


    Create Bin in St type.

    check storage type has standard rule and no HU check.





    Regards

    Suraj

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi,

      you use the PACI if you want to control the storage type search sequence product specific. But aren't there tons of other fields to determine the search sequence? Warehouse process type, stock type, quantity classification, etc. The PACI is ONE of the fields, and the one which make the most work, because it is master data and needs to be maintained. There might be a lot of cases where you will use it, but why use it if there is no need?

      What is "too many different storage types"? Why are there so many? And what is the difference and what do you use to find the "right" one?

      Brgds

      Juergen

  • author's profile photo Former Member
    Former Member
    Posted on May 13, 2014 at 08:55 AM

    Dear user ,

    Kindly maintain PACI in material master , create storage search sequence for same and rty creating task.

    Search sequence determines which storage type , bin to choose from , please refer below screen shot , kindly revert incase of any query.

    PACI in material master .

    Search indicator assigned to storage type , you can maintain multiple storage types.

    Search sequence : system will try to putaway to first empty bin in storage type T020.

    Hope it helps

    Thanks

    Jinoy


    Capture.JPG (37.8 kB)
    Capture1.JPG (35.2 kB)
    Capture2.JPG (44.2 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 12, 2014 at 08:32 AM

    Dear User ,

    Kindly provide screen shot for analysis.

    Thanks

    Jinoy

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.