Skip to Content
avatar image
Former Member

Table and field for RP Backflush checkbox in MFBF transaction

Dear All,

I am working on enhancement for transaction MFBF wherein on MFBF screen RP backflush check box is part of enhancement.

When I do operational confirmation by keeping check for RP backflush then it save the entry.

I can see the operation entry in AFRU but I can not see the check for RP backflush check box.

Can anybody help me by providing the information that in which table I will get RP backflush check box entry for the MFBF operational confirmation?

Or else provide the logic that how system find/determine that user has selected/checked the RP backflush checkbox?

Thanks,

Narresh

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

3 Answers

  • Best Answer
    May 09, 2014 at 03:13 PM

    Hello Naresh,

    The purpose of the RP backflush to confirm the operation and component is assigned to such operation (reporting point) then the components and activities gets posted and during the last reporting point generally GR happens. For RP backflush maintained mailstone confirmation in control key indicator and same control key assign to operation in routing.

    Please check this table S028, CEZP and CPZP for RP backflush information.


    I hope this information helpful to you,


    Thanks & Regards

    Umesh Mali

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    May 06, 2014 at 05:16 AM

    Dear All,

    Anybody help out to find out the above mentioned field-table?

    Thanks,

    Narresh

    Add comment
    10|10000 characters needed characters exceeded

    • Hi,

      Check the Milestone indicator( Type of confirmation) in the table AFRU for the operation confirmations.

      Reporting point is nothing but it is milestone confirmation in REM.

      Regards,

      Anupam Sharma

      Message was edited by: Anupam Sharma

  • avatar image
    Former Member
    May 12, 2014 at 05:28 AM

    Thanks. After search and your suggestions I have arrived at a decision to modify the logic accordingly.

    Means logic is set w.r.t. reporting point now.

    Thanks,

    Narresh

    Add comment