cancel
Showing results for 
Search instead for 
Did you mean: 

Book Publishing Scheduling in BPC10

Former Member
0 Kudos

Hello Friends,

I am trying to schedule to run reports every day at a specific time using book publishing wizard in BPC10.

The report has time dimension in the as select member in the page axis.

I am trying to run the book publishing with the time as variable member but when the report is published system is considering only the last time value the report was saved under.

I would want the report when published to the folder to consider the either the time variable member selected in the template or based on the user context?

Please let me know what I am doing wrong here?

Thanks in advance,

Shyam

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member230840
Participant
0 Kudos

Hi Vamsi

have you tried including Time Dimensions as variable with the paarm %CUR% ?

Former Member
0 Kudos

Any ideas please?

Former Member
0 Kudos

Hello Vamsi,

instead of selecting April 2014 have you tried to add Context() Member to Time on Variable Members selection?