Hello Experts,
I have created new FERT, HALB and ROH for new BOM in new production line. Parallely done Planning file entries for all these materials so that Planned orders get generated against created demand with active version in MD61.
For Gross Requirement planning(Strategy 11) with zero safety stock, Minimum/maximum lot size as 0/100 respectively and collective requirement in MRP4 view for particular active production version, system is not generating any planned order.
Planning run has been done at plant level for different horizons and individually for FERT also with different horizons and different parameters selections.
OPPR also doesnt suggest any parameters to be modified.
Would like to find reason/analysis for such behaviour by system.
Regards,
Ajit