Hi experts,
In my MD04 screen, dates are not showing lead time scheduled dates (showing only basic dates scheduling) even after MRP run with lead time scheduling.
Please let me know if there is a way that the date column in MD04, shows the finish date from lead time scheduling.
thanks
Jay