Ruled based ATP and Checking horizon

Hi Experts

I have one issues

when I activate the RULE based ATP in the checking instruction and it works well, but the system can not use the checking horizon function, this will cause if there is no enough stock in the triggering plant and substitution plant, the system can not confirm all requirement.

I want the system works like this
1. first check  stock in the triggering plant and substitution plant , if the substitution plant has a stock the system will generate a STO order

2. if there is not enough stock in triggering plant and substitution plant, the system will confirm the remaining requirement in the triggering plant using check horizon.

how to do  that?

does anyone have encounter this issue?

by the way, I have tried if I activate the RBA in the checking instruction and checking horizon in the check control, the RBA will not work, the system will only confirm the trigger plant stock , even if the substitution plant have enough stock , the system will ignore them.

if I only activate the RBA, the check horizon can not not be used.

I want to use both.

thank you in advance!

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • Apr 29, 2014 at 04:16 AM

    Hello Yamin,

    Did you try testing this by using the Calculation Profile in the RBA rule by maintaining the delay that is equal to the Checking Horizon time stamp ? Perhaps that should help ?

    Babu Kilari

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Babu

      Thank you for your help!

      actually I have tried . the RBA is not used   when I activate the check horizon in the check control.

      if I do not activate the check horizon, the RBA works and even if I I maintain calculation profile, the system still can not confirm the remaining requirement.

      Yamin.

  • avatar image
    Former Member
    Apr 29, 2014 at 12:40 PM

    Hi Expert

    does any one have solution?

    Thank you in advance!

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Bala

      thank you for your answer

      could you explain how to use TRLT concept in ECC? as I know if I activated the GATP , the system can not use the ECC ATP FUNCTION?

      by the way , I have checked some discussing , someone suggests to use calculation profile in the RBA, but I have tried, the system only display unconfirmed requirement as remaining requirement (unchecked) , the confirmed field still is zero.

      how to do  that?

      thanks!

  • avatar image
    Former Member
    May 04, 2014 at 06:48 AM

    Hi experts

    I have uplaoded the example file, can someone check  it and give some suggestion?

    thanks!

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 24, 2015 at 07:01 AM

    Hi Yamin,

    Were you able to resolve your issue? I am now facing the exact same problem. Please let me know if you found the solution for this!

    Thanks!

    Add comment