Hello!
I need to set up a Kanban solution for replenisment of Bin in Production.
I have set up a strategy 0006 and control cycle.
After I set the Kanban to empty, correct Transfer Requirement is created to move the quantity from WM storage to the Storage type and bin maintained in the Control cycle.
Question is, can I connect the postings of the GI to this production BIN, so when I reduce the quantity by GI, an Kanban signal is triggered when reaching defined quantity? Means, automatic change of status to EMPTY.
So no double postings of GI and than reducing the Kanban quantity.
Thanks for your help!