Apr 28, 2014 at 08:51 AM

Production plan problem in standard SOP

88 Views

Hi,

I am getting below problem when I am creating production plan in standard SOP..MC93.....

in the month of June 2014 sales is 100 and stock level required is 200 so when I executed production plan synchronous to target stock level system adding target stock level and sales qty and proposing production plan as 300. this is fine. but subsequent months system not doing the same for ex. if we take july 2014 month sales is 150 and target stock level is 300 in that case production plan should be 450 but system proposing 250. why so..can somebody help me out... now the other thing is days supply..in a month we have only 30 or 31 days system is proposing 58,60 like this is this standard behavior.. can some body throw some light on this...how days supply is calculated...

Thanks

Kumar