Skip to Content
0
Former Member
Apr 26, 2014 at 07:38 PM

Dynamic Work Schedule assignment not happening during Time Evaluation

47 Views

Hello Experts,

Am facing an issue where system is not assigning the dynamic work schedule during Time Evaluation where if EE is in the 23:00 hrs. to 6:00 hrs. as per IT0007 and instead works in 07:00 hrs. to 15:00 hrs. Than the system is assigning "<" pervious day indicator for both 7AM (P10- clock in) & 15PM (P20- clock out).

But where as it is working for other two shifts i.e. General 10am to 6pm and 3 pm to 11pm shift..

I have checked the T552V and T552W tables and there is no issue at all.