cancel
Showing results for 
Search instead for 
Did you mean: 

Plant specific BOM creation

Former Member
0 Kudos

Hello,

      My requirement is User must be able to create plant specific BOM creation. For this, Do we need to do any SPRO config in Material master side? or any other settings needs to be done? Kindly let me know... Thanks!!

Regards,

Saravana

Accepted Solutions (0)

Answers (3)

Answers (3)

former_member183424
Active Contributor
0 Kudos

Make the field Plant for CS01 via transaction variant SHD0.

Then user can't continue without enter plant.

Regards

Dev

Former Member
0 Kudos

Hi,

you can make BOM plant plus material specific from CS01.

regards,

mukesh

sudeep_a
Active Contributor
0 Kudos

Hi,

BOM is always at Plant level. This is standard SAP and no configuration/settings is required for this.

Regards,

Sudeep.

Former Member
0 Kudos

Hi,

    BOM can be either at plant and corporate level as well...i.e. Group BOM.... I thought for Plant specific BOM there might be some settings in the backend config.... Thanks!!

Regards,

Saravana