Hi,
I am facing problem that, I have one material with 2 operations. I have done GI for the second operation first.
Now my porblem is not able to do the GI for first operation, since the final issue indicator in production order marked.
Do I need to follow the sequence, first to give GI for first operation then second?
Please Explain.
Thanks with kind regards,
suresh.