cancel
Showing results for 
Search instead for 
Did you mean: 

WM-PP interface: create complete TR only for particular material

Former Member
0 Kudos

Hi all,

in our scenario we have set up the WM-PP interface, in order to have the WM Transfer Request automatically created when releasing the Production Order.

Due to the fact that the Availabilty Check on PP is active, we have set in the Production Schedule Profile this indicator --> Confirmed quantity for TR creation = X.

Now we have a business requirement who ask to us to verify if is possibile that, just for the material that have the Unit of Misure with a "Lenght" type, the related TR should be created only for the entire quantity of the requirement.
In other terms the system should work as if we had marked the flag "Create complete transfer requirement only".

Is possibile to manage this requirement using standard SAP functionalities?

Thanks a lot,

BR

Marco

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

We do not have anything like that based on material or material unit

BR