Hi all,
I have post the same question in SAP PP places but it seems is not right places, so I just want to post this question again in this places.
So I an trying to transfer BOM and routing to APO but the system said that I can not do that, the SAP message is:
I don't know which steps I miss in configuration
All material and work center are existed in APO.
I have trried with another FG with only one component, one operation and it can be transfer to APO without any error. But I have faced with this error when trying to transfer multilevel BOM with a lot of operation in 2 production version
Please help me to solve this problem
Regards