Transfer BOM & Routing to APO

473 Views

Hi all,

I have post the same question in SAP PP places but it seems is not right places, so I just want to post this question again in this places.

So I an trying to transfer BOM and routing to APO but the system said that I can not do that, the SAP message is:

Operation 003000000003, activity P: Minimum interval > Maximum interval

I don't know which steps I miss in configuration

All material and work center are existed in APO.

I have trried with another FG with only one component, one operation and it can be transfer to APO without any error. But I have faced with this error when trying to transfer multilevel BOM with a lot of operation in 2 production version

Please help me to solve this problem