Dear All,
Could some one tell how to tackle below scenario.
Month Jan : Raw material is costed with material cost 100 and Overhead cost 10 (Qty based O/h), Total cost is 110
Month Feb: Raw material is costed with material cost 110 and Overhead cost 10 (Qty based O/h), Total cost is 120
Is there any way we can avoid Overhead cost 10 in the the month of Feb with out removing Overhead group from Material master. So basically cost should be same as Jan i.e 110.
Thanks,
Ram