Hi ECM experts,

Please explain the below regarding Engineering change management

I am not able to see the changes made to bill of materials with a change package. System not picking the change.

The change package is released globally and it is linked with a lead change master.

But, the lead change master is not released. Is this the issue?

Thanks & Regards,

Suresh.