Hi ECM experts,
Please explain the below regarding Engineering change management
I am not able to see the changes made to bill of materials with a change package. System not picking the change.
The change package is released globally and it is linked with a lead change master.
But, the lead change master is not released. Is this the issue?
Thanks & Regards,
Suresh.