Hi Experts,

For a particular material, the production order start date as per scheduling goes beyond current month for 2 months in the past if the end date is 1 week from now. There are 5 operations.

Example

Operation 10:

Setup = 350 min

Labour = 180 Min

No. of splits =5

Takt time 36 min

Lot size = 600 pcs

We have tried the option of Overlapping and Minimum send ahead quanity of 1, 69, Parallel sequncing' etc but the production order scheduling is not getting shortened.

Is there any setting / configuration that need to be done so that the production order time can be minimized.

Please help.

br,

Ganesh