Hello Experts,
Is it possible in ECC to post multiple Proof of Deliveries (POD's) against a single delivery? Also need to know if it is possible, can is still be done after the first POD has been billed. Is there a user exit or note that can be applied to accomplish this? Let me know if this makes sense. Thanks in advance.
-Eric