Dear Experts,
We are plan to Migrate our BW server 7.2 ( under oracle 11.2 database ) to HANA database.
BW system Hardware is normal ( not HANA supported hardware ) we purchase separate hardware related to SAP HANA
1. What is the procedure to Migrate oracle database to HANA with Minimum downtime
2. Both ( Current BW system and HANA machine are different Architecture and Physically in different machine then How can we migrate from SUM with DMO
Because are per different document I read, they can not clear that SUM with DMO process running with same server our BW and HANA server is different physical machine
kindly guide me what is the procedure with my scenario where BW and HANA are different physical servers
Regrads