Hi gurus,
During the manual planning in BPS0 long runtime occurs.
FOX formulas are used.
There is lot of data selected, but it is business needs.
Memory is OK as I can see in st02 - 10-15% of resources are usually used, no dumps, but very long runtime.
I examine hardware, system, db with different methods, nothing unusual.
Could you please give me more advices, how I can do extra check of the system? (from basis point of view preferably)
BW 3.1. - patch 22
SEM-BW 3.5 - patch 18
Thanks in advance
Elena