Skip to Content
0
Apr 10, 2014 at 03:31 PM

Standard Cost Estimates - Subcontracting costs

2184 Views

Hi,

I am trying to run CK11N for a subcontracted material (price maintained at standard cost).

I have relevant subcontracting PIRs which have condition records for overheads.

However, unlike the "Material Val" tab where I have a strategy "Quotation Price via Condition Table", I do not see that strategy in the drop down for Subcontracting.

Does that mean I cannot condition my PIR condition records for subcontracting or am I missing something here?

Thanks,

Ryan