Hi,
I am trying to run CK11N for a subcontracted material (price maintained at standard cost).
I have relevant subcontracting PIRs which have condition records for overheads.
However, unlike the "Material Val" tab where I have a strategy "Quotation Price via Condition Table", I do not see that strategy in the drop down for Subcontracting.
Does that mean I cannot condition my PIR condition records for subcontracting or am I missing something here?
Thanks,
Ryan