I have configured the job as Depending on Load (Dynamic)/Periodic, but even job SWEQSRV is running for every 1hr
Case 1:
Operation Mode of Background Job: Depending on Load (Dynamic)
Number of events per read access: 150
Time interval between two read accesses : 1 Minutes
Interval until event queue next checked : 1 Minutes
Case 2:
Operation Mode of Background Job:Periodic
Number of events per read access: 150
Time interval between two read accesses : 1 Minutes
Note: I have tried UN-schedule background job and schedule background option but issue still exists.
I have not schedule this job SWEQSRV in SM36/SM37.
I have only 2 entries one is in Finished and other one is in Released.
Can any one suggest me how can I schedule this job to run every 1 minute.