Job SWEQSRV is running for every 1hr even it is scheduled for 1 min in SWEQADM

526 Views

I have configured the job as Depending on Load (Dynamic)/Periodic, but even job SWEQSRV is running for every 1hr

Case 1:

Operation Mode of Background Job: Depending on Load (Dynamic)

Number of events per read access: 150

Time interval between two read accesses : 1 Minutes

Interval until event queue next checked : 1 Minutes

Case 2:

Operation Mode of Background Job:Periodic

Number of events per read access: 150

Time interval between two read accesses : 1 Minutes

Note: I have tried UN-schedule background job and schedule background option but issue still exists.

I have not schedule this job SWEQSRV in SM36/SM37.

I have only 2 entries one is in Finished and other one is in Released.

Can any one suggest me how can I schedule this job to run every 1 minute.