on 04-09-2014 1:00 PM
Hi All,
I am in the process of trying to apply SPS update to the above system using Maintenance Optimizer, but when I get to the Select Target screen there is nothing listed in the drop down.
I chose Calculate File Automatically then the next screen simply said
Update Options |
Select update option for SAP EXCHANGEINFRASTRUCTURE |
Select Target was after this.
I am running the following components and it correctly identifies we are currently on SPS28
Software Components | ||||
Software Component | Release | SP Level | Software Component Version | Additional Info |
PI_BASIS | 2006_1_640 | 0012 | PI_BASIS 2006_1_640 | |
SAP ABA | 640 | 0028 | SAP ABA 6.40 | |
SAP BASIS | 640 | 0028 | SAP BASIS 6.40 | |
SAP BW | 350 | 0028 | SAP BW 3.50 | |
ST-A/PI | 01N_640BCO | 0000 | ST-A/PI 01N_640BCO | |
ST-PI | 2008_1_640 | 0004 | ST-PI 2008_1_640 |
How do I get it to find the latest SPS which I believe to be 31 at this point?
There is also this warning in the log :-
The instance 7 (number: SAP Exchange Infrastructure) of 01200615320900001103 is ignored.
Message no.AGS_MOPZ_PLAN_MSG073
Diagnosis
The instance
7
(number:
SAP Exchange Infrastructure
) of product version
01200615320900001103
cannot be adapted to the new product version
01200615320900001103
.
System Response
This instance is ignored during upgrade; it won't be taken into account by Maintenance Optimizer delta calculation.
Procedure
You can ignore this message.
Thanks
Craig
UPDATE
I think I have managed to solve this kind of. I changed the Product assignment to SAP NETWEAVER 04 and chose Process Integration (PI/XI) as relevant assigning the Java stack XID as Techincal system.
This then at least gave me the option in MOPZ to upgrade the system to SAP NETWEAVER 7.3 or SAP EHP1 FOR SAP NETWEAVER 7.3.
Seems that MOPZ or something really didn't like the Product assignment of SAP EXCHANGEINFRASTRUCTURE 3.0.
Cheers
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
UPDATE
OK since this system has it's own SLD I have configured it to send a copy to SOLMAN SLD using SLD Bridge. So far so good no errors and everything looks ok.
However it still complains, so I figured may be the CR Content was out of date. Sure enough it was on CR 2.0 still. So after days of updating to CR 9.14 and model version 1.6.38 I tried again.
But when I look at the SLD for the JAVA components they don't match, ABAP components are fine though.
How do I resolve this?
Thanks
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vikram,
These notes are not relevant as they refer to issues with Enhancement Packs. This issue has nothing to do with EP's.
I have now update the XI 3.0 system manually to SPS31 both ABAP & JAVA but would still like to get Solution Manager working with it properly.
I have even installed LANDSCAPE VERIFICATION 1.0 SP3 and it shows that everything is fine in the SLD for XI.
Thanks
Craig
UPDATE
I've just tried running another MOPZ after I've updated to SPS31 and got these warning messages in the log :-
It's almost as if the product SAP EXCHANGEINFRASTRUCTURE 3.0 isn't recognised properly.
User | Count |
---|---|
84 | |
24 | |
12 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.