cancel
Showing results for 
Search instead for 
Did you mean: 

Exchange Infrastructure 3.0

former_member204618
Active Contributor
0 Kudos

Hi All,

I am in the process of trying to apply SPS update to the above system using Maintenance Optimizer, but when I get to the Select Target screen there is nothing listed in the drop down.

I chose Calculate File Automatically then the next screen simply said

Update Options

Select update option for SAP EXCHANGEINFRASTRUCTURE

Select Target was after this.

I am running the following components and it correctly identifies we are currently on SPS28

Software Components

Software Component

Release

SP Level

Software Component Version

Additional Info

PI_BASIS

2006_1_640

0012

PI_BASIS 2006_1_640

SAP ABA

640

0028

SAP ABA 6.40

SAP BASIS

640

0028

SAP BASIS 6.40

SAP BW

350

0028

SAP BW 3.50

ST-A/PI

01N_640BCO

0000

ST-A/PI 01N_640BCO

ST-PI

2008_1_640

0004

ST-PI 2008_1_640

How do I get it to find the latest SPS which I believe to be 31 at this point?

There is also this warning in the log :-

The instance 7 (number: SAP Exchange Infrastructure) of 01200615320900001103 is ignored.

Message no.AGS_MOPZ_PLAN_MSG073

Diagnosis

The instance

7

(number:

SAP Exchange Infrastructure

) of product version

01200615320900001103

cannot be adapted to the new product version

01200615320900001103

.

System Response

This instance is ignored during upgrade; it won't be taken into account by Maintenance Optimizer delta calculation.

Procedure

You can ignore this message.

Thanks

Craig

Accepted Solutions (1)

Accepted Solutions (1)

former_member204618
Active Contributor
0 Kudos

UPDATE

I think I have managed to solve this kind of.  I changed the Product assignment to SAP NETWEAVER 04 and chose Process Integration (PI/XI) as relevant assigning the Java stack XID as Techincal system.

This then at least gave me the option in MOPZ to upgrade the system to SAP NETWEAVER 7.3 or SAP EHP1 FOR SAP NETWEAVER 7.3.

Seems that MOPZ or something really didn't like the Product assignment of SAP EXCHANGEINFRASTRUCTURE 3.0.

Cheers

Craig

Answers (1)

Answers (1)

former_member204618
Active Contributor
0 Kudos

UPDATE

OK since this system has it's own SLD I have configured it to send a copy to SOLMAN SLD using SLD Bridge.  So far so good no errors and everything looks ok.

However it still complains, so I figured may be the CR Content was out of date.  Sure enough it was on CR 2.0 still.  So after days of updating to CR 9.14 and model version 1.6.38 I tried again.

But when I look at the SLD for the JAVA components they don't match, ABAP components are fine though.

How do I resolve  this?

Thanks

Craig

former_member204618
Active Contributor
0 Kudos

Can no one help?

Thanks

Craig

VJain
Active Contributor
0 Kudos

Hi Craig,

Please chekc these notes:

1766596 - EHP product version is not shown in Maintenance Optimizer product version menu.

1702990 - Error Transaction must be assigned to a Standalone Product

Thanks

Vikram

former_member204618
Active Contributor
0 Kudos

Hi Vikram,

These notes are not relevant as they refer to issues with Enhancement Packs.  This issue has nothing to do with EP's.

I have now update the XI 3.0 system manually to SPS31 both ABAP & JAVA but would still like to get Solution Manager working with it properly.

I have even installed LANDSCAPE VERIFICATION 1.0 SP3 and it shows that everything is fine in the SLD for XI.

Thanks

Craig

UPDATE

I've just tried running another MOPZ after I've updated to SPS31 and got these warning messages in the log :-

It's almost as if the product SAP EXCHANGEINFRASTRUCTURE 3.0 isn't recognised properly.