Skip to Content
0
Apr 09, 2014 at 06:49 AM

EPM Context Unlock after Transport

59 Views

Hi

After transporting Input forms from Development to Quality server the context on every sheet got unlocked.

As i don't have page axis for some reports and have manually selected and locked the dimensions in the context itself.