how to update dual stack kernel

hi all,

all we know sap support dual stack in slm and PI.

I had a slm71sr1 install with swpm/jvm use kernel 402 in win2008.

I want to update kernel to ver600.

the abap stack can logon after the update.

but mmc show the java can't startup.

I'd try to run sapcpe

sapcpe pf=<drive>:\usr\sap\<SAPSID>\sys\profile\<instance profile> list:<drive>:\usr\sap\<SAPSID>\sys\exe\<uc|nuc>\<platform>\j2eeinst.lst

and

sapcpe pf=<drive>:\usr\sap\<SAPSID>\sys\profile\<instance profile> source:<sapjvm directory> list:<sapjvm directory>\sapjvm_<version>.lst


but the java instance still can't startup and i had to restore the old kernel.


any one had some idea for dual stack update kernel?


Thanks.


B&B

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

4 Answers

  • Apr 09, 2014 at 05:29 AM

    Hi

    Kindly refer the SCN link

    http://scn.sap.com/docs/DOC-45629

    BR

    SS

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi,

      I think the sapcpe program does not copy the kernel to /SCS01/exe.


      Try to copy the same kernel to /SCS01/exe.


      Regards

      Maruthi V

  • avatar image
    Former Member
    Apr 09, 2014 at 06:22 AM

    Please check the following link

    http://scn.sap.com/thread/784016

    Add comment
    10|10000 characters needed characters exceeded

  • Apr 09, 2014 at 10:35 AM

    The procedure is same for both the stacks.

    You just need to make sure that file are getting replicated to the local executables area.

    Regards

    RB

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Apr 15, 2014 at 03:04 AM

    thanks all reply.

    i has a question.jspm was replaced by sum.is sum can use for upgrade kernel?