Hi Guys,
I have a requirement wherein we have to redirect EDI PO's from one SAP system to another. What should my approach be? Since both the systems have the PO's setup, how can I differentiate the logic in such a way that latest system where we're migrating the code behaves in a same way as it is currently doing in two systems. I hope I didn't confuse you 😊
--
Prineet