MR estimation

104 Views

Hello Experts,

Need you help to understand this.

When I install a device at an installation I have to maintain a period consumption which form a basis for estimation when required.

In a scenario, I have a device which is installed at multiple installations(billing related), and I change the period consumption through EL56 for one contract(or installation) which does not have full installation of the device.

Now, when I estimate the MR for the original contract which has full installation of the device, the MR gets estimated on basis of the period consumption I maintained through EL56 for another contract, even though I have not maintained it for the contract for which I am estimating. Could you please let me know if my understanding is correct or not? If this is correct, can I avoid it?