cancel
Showing results for 
Search instead for 
Did you mean: 

In DMS,CV01N,CV02N, object link for production order is not enabeling

Former Member
0 Kudos

Hi,

To the Document in cv01n or cv02n, while trying to give production order in Object Link : Production order tab, The order tab is not enabling. How to enter the production order in object link and can we do this thing in change mode.

Regards,

Mastan.

Accepted Solutions (0)

Answers (2)

Answers (2)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi Mastan,

You need to enable the object PORDER and  screen number 251.This is used to transfer of Document from Material master or Bill of Material based on Production Scheduling Profile (Header material) Configuration.

Please refer below document for more details

http://scn.sap.com/docs/DOC-35058

Regards,

R.Brahmankar

Anupam1143
Active Contributor
0 Kudos

HI

Check in OPKP SFC profile whether you have selected the Documents -links material and BOM on creation under automatic action.Also check in DC10 for your document type you have maintained proper object links for Production order with object PORDER and screen numebr 251

Regards,

Anupam Sharma

Message was edited by: Anupam Sharma