on 04-01-2014 8:04 AM
Hi All,
Time evaluation is used for generating Earned Leave Qouta. In Time Evaluation run , system is generating correct quota but the same is not getting updated in Infotype 2006.
Kindly help me in this issue.
Thanks
Tulika Sinha
Hi Tulika,
Infotype 2006 is not getting updated since P2006 might not be filled while executing the time evaluation.
Debug the Perform "update_i2006" in the function "Quota", to find the root cause.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
R u checking the details with the live time evaluation run?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sridevi,
Time evaluation is run at the starting of the calendar year. It generates the quota based on previous years attendance.
For eg ,if time evaluation is ran in Jan 2014 , then as per attendancve in 2013 it calculates EL.PDC recalculation date is set as 01.01.2014. I have changed PDC date to 01.01.2013 still system is not updating the Absence Quota to 20006.
Thank you
Hi,
Please check if you have configured in T555L.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.