Hi all,
Can you tell me if there is a R/3 report which lists out the planned and actual costs for a project and displays it for each network and activity? I want these values at the activity level.
I found a report which lists out these values for each network, but I cannot drilldown to the activity level. Please help.
Thanks,
Satyajit.
important is that your networks are activity-assigned. otherwise the costs will only show up on network header in PS infosystem.
there is a setting, check either network profile or network type.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Budget control at Network activity level
There is a requirement for a customer to activate Budget control functionality at Network activity level..As far as I know , it can be done only at the WBS element level.
Is there any setting or custom development through budget can be controlled at WBS element level.
With regards,
Mrinal K Roy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
There are several reports in the system that fill your demands. Try these:
S_ALR_87013532: drill down to network level
S_ALR_87013542: Navigate thru the structure in the left frame. The white sheet symbol represents figures, the yellow folder symbol represents a sum.
Go to the PS Infosystem for furher reports, there is almost nothing you cannot extract from PS
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.