Pre-Golive Best Practise

Former Member
0 Kudos

Hi ,

Before going to Go-live what are the Best Practise according to SAP which need to be done?

Kindly Suggest !!!!!

Regards

Adil

Accepted Solutions (1)

Accepted Solutions (1)

former_member188883
Active Contributor
0 Kudos

Hi Adil,

Please check the following from basis perspective

1) Production is installed

2) All the required patches have been applied

3) Backup has been configured and tested

4) If having HA, it is configured and tested

5) Pre-Golive session has been completed by SAP

6) Post Go-live session scheduled by SAP

7) User master and authorization has been completed

😎 All the necessary monitoring has been enabled through solution manager

9) EWA configured and operational.

Hope this helps.

Regards,

Deepak Kori

Answers (2)

Answers (2)

former_member187565
Active Contributor
0 Kudos

Hi Adil,

Just adding to what Mr Kori said above also raise a SAP message (may be component SV-BO-REQ ) and schedule a date for this activity.

Solution manager is installed or not

Regards,

Rafikul

Sriram2009
Active Contributor
0 Kudos

Hi Adil

Kindly refer the link http://service.sap.com/earlywatch (Required S user id)

SAP Support Services - under that you can find the SAP Go-live check link PPT file

BR

SS