on 02-27-2014 10:30 AM
HI Gurus,
i have come across a situation the requirement is to configure a NEW MRP Type with NEw selection rules(REquirement Calluclation)
in the standard SAP system MRP Type is assigned with MRP Procedure by which the Behaviour of the MRP type will be decided. can any body tell me
what the scope of THis MRP procedure, and how can we configure new MRP Procedures according to our requirement.
Thanks&Regards,
Venkat.
Hello Venkat
The customizing to define a new MRP type is OMDQ, however, you can only choose one of the existing MRP procedures. The logic behind the MRP calculation is very complex and it cannot be changed on customizing.
There are some BAdIs that allow you to influence the MRP behavior.
Check the following document for more details about the BAdIs available for MRP:
BR
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi cateno and naresh,
thank you for the answers.
Regards,
Venkat.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can customize the parameters of the MRP types delivered with SAP R/3 according to your own requirements. You can also add new MRP types.
Take the help of SAP documents for the same. Below link may guide you.
MRP Procedures (SAP Library - Material Requirements Planning (PP-MRP))
But as suggested by above expert it is very difficult to set the logic and configuration for new MRP procedure creation.
Regards,
Narresh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.