Hi All,
How to do tolerance time in time management.
Minimum tolerance time is 15 minute and maximum tolerance time would be 2 hour in a month, after that loss of pay will happen.
How to do in the system in time management Please suggest me.
Regards,
Anup
Tolerance limits are set in the Daily Work Schedule (V_T550A) configuration.There is a begin and end tolerance fields against each DWS. Please read SAP help on these fields.
For managing the maximum tolerance limit, you would need to capture the daily violations in a Time Type and at the end of the month you will need to take a decision if the value in the Time Type is > 120 minutes and convert it into a LOP.
For the tolerance violations each day you will need operations like HRS=PBEG and HRS=SNTB to see the violations each day. This difference needs to be captured in a Time Type and evaluated at the end of the month.
Hope this helps.
Regards
Pramod
Hello Anup,
Which TM you are using either Positive / Negative ?
This well done by the PCR only, you have to write PCR for the late time entry and at the end the month calculate the total time and based on your condition > 2Hrs is no LOP if < 2Hrs treat as LOP.
regards,
praneeth kumar
Add a comment