COMAC options

Former Member
0 Kudos

Hello group,


In COMAC, could someone define the differences in the following options?


1.ATP check

2.Check according to material checking group

3.Individual material check according to the  check group

Thanks,

Ksnyder

Accepted Solutions (0)

Answers (3)

Answers (3)

former_member206498
Contributor
0 Kudos

Hi Ksnyder,

In the availability check control customizing (OVZ2), there are 2 options on how the system perform availability check:

  • ATP Check: all requirements for the component is checked against ATP quantity, which includes stock, receipt, etc.
  • Check against planning: the requirement for the component is checked against open planned independent requirement (PIR) for the component.

Each option is represented by a checking group that is then assigned to a material.

During collective availability check as in COMAC, those parameter gives you the options to choose how the availability check should be performed:

  • A (ATP check): all materials are processed with ATP check despite their checking group
  • I (Check according to checking group: materials are processed based on assigned checking group
  • P (Check against planning): all materials are processed against planning, despite their checking group

Regards,

Julian

former_member209265
Active Contributor
0 Kudos

Hi Ksnyder,

Please refer the link.

Checking the Availability of Material - Production Orders (PP-SFC) - SAP Library

Regards,

Krishnendu.

Former Member
0 Kudos

K,

It is not clear to me where within COMAC you are seeing these three phrases.  Can you please elaborate?

If you are talking about the "Scope of processing", put your cursor on the field and press "F1" for detailed help on these choices.

You can see info about ATP check and about Material Checking group in online help at

Checking the Availability of Material - Production Orders (PP-SFC) - SAP Library

Best Regards,