Inspection lot valuation for in process inspection

A confirmation process contains three operations. I have assigned MIC to second and third operations and inspection type 3 is activated. When a production order is released and confirmation is done, I get inspection lots.

I want to know how to manage these inspection lots in terms of UD status.

  1. If I reject an inspection lot, what would happen?
  2. Can I control the confirmation on the basis of inspection lot valuation?
  3. If UD is rejected for second operation, can third operation be controlled?
  4. If second operation UD is not done, can we prevent third operation confirmation?

Please help

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    Feb 19, 2014 at 08:22 AM

    Hi Sunny,

    First of all you will not get inspection lot for 03 after Confirmation of an order it will be created as soon as you release Production Order.

    • If I reject an inspection lot, what would happen?
      Nothing will happen regarding Order Confirmation. You can record results, record defects and Set Usage Decision as "Rejected". This will hit corresponding tables and will also reflect in your reports.
    • Can I control the confirmation on the basis of inspection lot valuation?

    For inspection point valuation you can enter yield, scrap, rework quantity which will reflect at the time of Confirmation.

    • If UD is rejected for second operation, can third operation be controlled?
    • If second operation UD is not done, can we prevent third operation confirmation?

    You can not give UD for An OPERATION,  UD will always be given for Inspection lot.

    but there are certain controls you can have for operations, Go to OPK4 and Explore.

    Check below links for the same.

    In-process inspection- operation wise result re... | SCN

    http://scn.sap.com/thread/1559735

    Amol.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Amol Manave

      So this is similar to different operations assigned in a single task list of an inspection plan. When go to results, we need to select an operation. I got it.

      I guess all my issues are resolved now and hence should close this thread. I'll run a scenario with all this information and will come again to seek your assistance if stuck somewhere again.

      Thanks a lot for your time Amol. I aapreciate 😊

      Sunny

  • avatar image
    Former Member
    Feb 19, 2014 at 07:48 AM

    In-process Inspection is mainly to control the production process. While doing results recording, you can control the yield %.

    Do the settings in OPK4 for your order type.