on 02-18-2014 9:55 AM
Hi,
In OPK4 I have maintained "E: Error when operation sequence is not adhered to" for process order type. But while confirming system allow me to confirm 0040 without confirming 0020.
Thanks,
Jishu
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Jishu,
Check in the master recipe level,whether a relationship(such as FS,SS,FF,SF) and Finish Start exists,if
not maintain the same and then check in COR6N and update.
Regards
Mangalraj.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Jishu,
Config is correct. Also please check the control key. Change the control key into Confirmation required if any control key set with confirmation not required or milestone confirmation.
Thanks & Regards,
Ramagiri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello
On the master recipe, check if you have properly defined the relationship between both phases.
BR
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Jishu,
Kindly please check this thread,
http://scn.sap.com/thread/3387834
As of now due to limited access I'm unable to check completely in the system.
Regards
Mangalraj.S