Dear All

My client all ready using Demand Management & MRP for FG material. They also want to plan for Packing material. I havnt idea of packing material planning.

Currently packing material maintained in BOM. For Example My FG material FG1. Material FG1 has multiple bom in 1st bom SFG1 & Pack1 material and 2nd alternative bom SFG1 & Pack2 material. They have the month plan of FG1 as well as pack1 & pack2 material suppose FG1 plan 10000kg ; pack1 plan 200 bag; pack2 : 50  drum.

I suggest to maintain the production version in MD61 (weekly planning). But they said in week we can use the bag or drum.

So i can i plan for Pack material ?

Regards

JS55

Accepted Solutions (0)

Answers (4)

Answers (4)

former_member214153
Active Participant
0 Kudos

Hi JS,

You can use the Reorder base planning as explain by Rupesh or

you can use Variant configuration if you use more than 1 packing material.

Thanks,

Anurudh

former_member186386
Participant
0 Kudos

Hi JS55,

    

          You can use following activity:

1. For packing material- MRP type : PD

2. Lot size : EX

3. Planning strategy : 40 (Preplanning with Assembly)

Regards,

Santosh Sharma

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi JS 55,

Use the reorder point planning for these packing materials such as VB.

System will generate a new requisition when the stock falls below the reorder point defined for the material.

Please the SAP help link,

Reorder Point Planning - Material Requirements Planning (PP-MRP) - SAP Library

Regards,

R.Brahmankar

Former Member
0 Kudos

Dear

I agree but due to alternative bom System always plan for 1st bom its means dependent req will create for pack1 only. How come requirement generate for pack2 . Currently i am maintain FG1 plan in md61.

Regards

JS55

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi JS,

For both the packing materials use reorder point planning define the reorder level and safety stock in material master. So when stock falls below the reorder point system will generate the procurement proposal. Please test the same and come back.

Regards,

R.Brahmankar

former_member184666
Active Contributor
0 Kudos

Hi JS,

In material master MRP1 view maintain MRP type as VB -Manual Reorder point, Reorder Point (Some qty as per business need) ,Maintain the safety stock in MRP 2 view.

If stock of the material falls below the reorder point system automatically plan for procurement proposals upon MRP run.

Please test and come back.

Thanks & Regards,

Ramagiri

former_member184574
Active Contributor
0 Kudos

Hi,

Then you need to use the quota arrangement functionality..create two production versions one having BOM with Pack1 as input and second one having BOM with input Pack2...

Now maintain the quota arrangement through MEQ1...give 50% to PV1 and 50% to PV2....

this will fulfill your requirement...

Thanks

Kumar

former_member184574
Active Contributor
0 Kudos

Hi,

maintain the planning strategy like 10 in MRP 3 view for packing materials in their material masters...put the requirement through MD61 then do the planning run for FG1 through MD02 .... system will plan for Packing materials for both requirement from MD61 and also for dependent requirements from FG1 material...check and revert....

Thanks

Kumar