Hi,

Please guide me the steps to follow for Document type creation in Document Management system. i am new to the Document Management system. User is asking me to create document type. What steps i need to follow.

Regards,

Mastan.

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Posted on Feb 07, 2014 at 08:21 AM
    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Ramagiri

      Thank You very Much,

      http://scn.sap.com/docs/DOC-35058

      The Document is giving a very good knowledge on DMS. Thank You. With this Document only i understood the Link DMS with Production orders and material master and bom and production scheduling profile.

      But I ahve strucked in two points. i have mentioned with screenshots in Julian reply. please guide me.

      Regards,

      Mastan.

  • Posted on Feb 07, 2014 at 08:22 AM
    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Krishnendu Das,

      Thank You very Much,

      http://scn.sap.com/docs/DOC-35058

      The Document is giving a very good knowledge on DMS. Thank You. With this Document only i understood the Link DMS with Production orders and material master and bom and production scheduling profile.

      But I ahve strucked in two points. i have mentioned with screenshots in Julian reply. please guide me.

      Regards,

      Mastan.

  • Posted on Feb 07, 2014 at 08:45 AM

    Hi Mastan,

    Open DC10 transaction in change mode and click "Add New Entries" button. Ask the user whether the new document type has similarities with the existing ones and set the parameters accordingly. You can use copy function, too.


    Regards,

    Julian

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      As far as i undersatnd, i think you must follow these steps,

      goto Tx- DC10select your Document Type

      click on 'Define Document Status'


      select your status wich you want to display at initial screen during creation in CV01N

      then make the status type as 'I'

      If you want 'release' only after 'created/work reuest' then enter your status variable for 'Created' in the field the 'Prev.1' in 'Release' status configuration.

      i.e let CT be the varibale for CREATED status, then enter CT in the field Prev.1 while defining the RELEASE status

      Capture1.JPG (84.7 kB)
      Capture3.JPG (65.4 kB)
      Capture2.JPG (88.1 kB)
  • author's profile photo Former Member
    Former Member
    Posted on Feb 13, 2014 at 06:23 AM

    Hi,
    Please share the answer for your question and close the thread if you have got what you really looked for,

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.