cancel
Showing results for 
Search instead for 
Did you mean: 

how can we determine the Usage Decision upon Material inspection characteristic critical factor

Former Member
0 Kudos

Dear gurus,

when we receive goods inspection lot is created.now when we put inspection result in inspection result If any critical Material Inspection Characteristic failed then user should not allow to accept the material via usage decision, in this case Usage Decision will always be rejected and anyhow users should not change the Usage decision.

how we configure this scenario

thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Use exit

QEVA0010  UD: Usage decision check - While saving UD system will check for results and UD code and then post if the UD is appropriate.

If stock posting check is also required use

QEVA0001  Enhancement: Quantity posting for usage decision