Skip to Content
0
Former Member
Feb 05, 2014 at 11:56 AM

Inspection plan assignement for material

19 Views

Hi Gurus,

I have inspection plan group IN930004 valid from date 29.04.2011 & another group IN930207 created on 16.11.2011 & changed on 17.12.2013. I have an inspection lot created on 28.01.2014.

problem we are facing is that when in inspection lot we try to assign inspection plan by clicking on Task list/Spec group IN930004 is getting assigned to the lot. System does not display list of the groups. Our requirement is to assign group IN930207 to the lot.Multiple specifications are used in both the groups.

Pls. guide how to resolve the issue.

Regards

Amit