on 02-04-2014 11:29 PM
Gurus,
we are working with partial lot creation & batches for in-process inspection.
So, I created production order , entered 2 inspection points, then I assigned each inspection point a partial lot & a batch number to that inspection point until all confirmations are done.
so Now the total yield of production order is 2 pieces where 1 piece is assigned to batch 400 & 1 piece is assigned to batch 401.
but when performing goods receipt for the production order the system doesn't recognize the 2 already created batches, instead the system creates a new batch "403" for the receipt of the 2 pieces.
So, how can I receive batches 400 & 401 that was created by QM ??
any suggestions??
Hi,
I think you have to do the confirmation of the order through results recording only.
In operation you keep the settings of valuation and stock posting.
Sreenath Chalasani
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.