Dear All,
Is it possible to have both reorder point and PIR to be considered together.
Case 1:
If we have Stock 200 kg
PIR 500 kg
Reorder point 100 kg
system should raise 300 kg planned order when MRP is run
Case 2:
If we have stock 50 kg
reorder point 100 kg
fixed lot size 1000 kg
system should raise 1000 kg planned order when MRP is run
Regards,
Joseph.