Capacity, constrained load and unconstrained load in hours and shifts

0 Kudos

Hello,

The time dependent key figures capacity limit, unconstrained load and constrained load shall be visible and maintainable both in shifts and hours.

The ratio of shifts to hours shall be fixed in the model – 8 hours are 1 shift for all resources.

What is the easiest way to achieve this?

Thanks and best regards,

Joachim

Accepted Solutions (1)

Accepted Solutions (1)

former_member217157
Active Participant
0 Kudos


Hi Joachim,

If the same Key Figures can be maintained and viewed in different Units of Measure, then you need to configure UOM conversion for these KFs in S&OP Model Configuration.

Best Regards,

Raghav